教育资源公共服务平台
站内导航

load 1

load 1 双语例句

1. This power load of project belongs to the level 1, introduces two group 10KV by the municipal administration electric power electrical network the independent power supplies to use the VV22 electric cable to put on SC100 the steel pipe to bury lays directs to the basement switching house.
    本工程电力负荷属于一级负荷,由市政电力电网引入两路10KV的独立电源采用VV22型电缆穿SC100的钢管,埋地敷设引至地下层配电房。

2. On the basis of analyzing and studying on the former test results of hoist load of reverse tainter valve which is the main type of valves for navigation locks, a large scale (1:16) physical model for YinPan lock culvert valve has been built. Through the steady and unsteady flow experiments, structure of the acting flow on the valve has...更多been observed and analyzed in detail. It has been found that the valve''s net hydrodynamic hoist load can be composed of two parts, one is the acting force result from water in culvert and the other result from the descending and rising flow in valve well. Furtherly the formula of the net hydrodynamic hoist load has been put forward by theoretic analysis, and the calculation results has been proved to be agreed well with the experimental results. Meanwhile, the factors affecting the net hydrodynamic hoist load and their changing laws have been further studied. The further research direction is also been pointed out.
    在大量分析研究前人有关船闸主要门型—反向弧形门启闭力试验成果的基础上,建立了大比尺的输水阀门物理模型,通过恒定流和非恒定流试验,对作用在阀门上的水流结构形态进行了详细的观察和分析,认为阀门的净动水启闭力构成可以分为两大部分,即廊道水流对门体的作用力和门井下降或上升水流的作用力,并通过理论分析得到了由这两部分作用力构成的净动水启闭力计算公式,与试验结果吻合较好,同时还对影响阀门净动水启闭力的各种因素及其变化规律进行了进一步探讨,并指出了需深入研究的方向。

3. The floc sludge of PFC can be removed 75% organics and the effluent COD is 800mg/L under condition of 1.5 days HRT and treated by thermophilous EGSB anaerobic reactor, and the reactor volume organic load is 2.65kgCOD/m〓.
    投加聚合氯化铁混凝剂得到的絮凝污泥在35℃环境中控制1.5d的水力停留时间,出水有机物含量可以降到800mg/LCOD〓左右,去除率在75%左右,厌氧反应器最大负荷为2.65kgCOD/m〓。d; 5。

4. load 1是什么意思

4. When mixed into the same carbon fiber quantity is 1.0%, differ age material''s AC impedance chart is discrepancy very much, along with to hydrate age''s add, C-S-H gel isa great deal of form, the solution resistance at the concrete is gradually aggrandizement, the carbon fibre of here qua transmit electricity quality disperse would leading effect of conductance, along with the add of exterior load, the transmit electricity quality of concrete is almost nothing change, till breakage, resistance change rate tempestuousness add, and that the resistance change rate along with inside stress linearity add of corbon fibre concrete in elasticity phase, when near peak value load, resistance rate just gradually add, indicate the test sample would be about to breakage.
    当碳纤维体积掺量同为1.0%时,不同龄期材料的交流阻抗谱相差很大,随着水化龄期的增长,C-S-H凝胶大量形成,水泥基材料中的溶液电阻逐渐增大,此时作为导电性分散相的碳纤维将起电导的主导作用。随着外部荷载的增加,基准水泥基材料的导电性几乎无变化,直到破坏时,电阻变化率剧烈增大,而碳纤维水泥基材料在弹性阶段其电阻变化率随内部应力线性增加,当接近峰值荷载时,电阻率才逐渐增大,预示试件即将破坏。

5. load 1

5. Results In comparison with the original steel plate, the flexibility of the improved steel plateunder the action of normal tensible load, y-direction and z-direction bending moment increased 60.1%, 30.8% and 61.2% respectively.
    结果改进后的内固定钢板比原来的内固定钢板在正向力、弯矩My和Mz的作用下,柔度分别增加了60.1%、30.8%、61.2%。

6. When fire occurs, the ordinary glass can instantly form the great temperature difference between the head-on fire surface and the back fire surface, under such temperature effect, there is very strong non-uniform thermal load after 1 or 2 minutes, it causes the glass to crash, even if physical tempered glass, also will be crashed completely after 3 or 5 minutes.
    防火原理:Fireproof Principle 火灾发生时,普通玻璃的迎火面与背火面会瞬间形成较大温差,在这样的温差作用下,1、2分钟便会产生很强的不均匀热应力,导致玻璃破碎,即便是经过物理钢化后的玻璃,3、5分钟后也会完全破碎。

7. 10 When a motorized vehicle carries cargo, the weight of the cargo cannot exceed the weight specified in the driving license and the length and width of the load are not exceed the compartment boards by one meter.
    1.1.2.10 机动车载物不得超过机动车行驶证上核定的载质量,装载长度、宽度超出车厢不得超过1米。

8. Through researching the mechanism of biological nitrification and denitrification and actual project application of the technology and related literature materials, the obtained results are as follows:(1) Anoxybiosis is effective to the removal of COD; after the anoxic process, BOD/COD of the outflow increases, it shows that the degradation ability of wastewater is improved; anoxybiosis is insensitive when shock loading of inflow wastewater varies greatly; (2) It is demonstrated by the operation of inoculation and cultivating that biofilm takes two weeks to succeed in cultivating on packings and the removal ratios of NH3-N and COD get 50% and 70% respectively, when gas-water ratio is 6:1, HRT is 7.3 hour, water temperature is above 15°C; (3) It is demonstrated that gas-water ratio, hydraulic loading, HRT, temperature, pH etc are important factors which influence the removal effect of pollutants, when the gas-water ratio is 6:1, hydraulic loading is about 0.38kgNH3-N/m~3.d, water temperature ranges from 15°C to 27°C, pH ranges from 7.5 to 8.0, the BIOFOR removal effect of pollutants is the best; (4) The operation indicated that, this technology has strong ability of nitrification and denitrification; it has extremely vital significance for reducing the water body eutrophication; (5) It is confirmed the feasibility and the usability of preanoxic-BIOFOR process to treat L-lactic acid production wastewater. The experiment indicated that the treatment effect of this technology is very good and also shows that the technology has many advantages, such as small volume, high treatment efficiency, good effluent quality and strong endurance to load variation, this technology is a new and economical wastewater treatment process.
    通过对生物脱氮机理的研究和该组合技术的实际工程应用,并结合有关文献资料,取得如下结论:(1)预缺氧池对L-乳酸生产废水中的COD去除具有一定的效果;废水中难降解的高分子物质经过缺氧工段分解为易于氧化降解的物质,浮状有机物在水解菌的作用下,将不溶性有机物水解为溶解性物质;预缺氧池具有较强的抗冲击负荷能力;(2)BIOFOR接种挂膜过程表明:HRT为7.3h、气水比为6:1、水温保持在15℃以上,经过半个月生物膜即以形成,NH_3-N和COD的去除率分别达到50%和70%左右;(3)研究表明:气水比、水力负荷、HRT、温度、pH等是影响污染物去除效率的重要因素,在气水比为6:1,NH_3-N容积负荷为0.38kgNH_3-N/m~3·d,温度在15℃-27℃,pH在7.5-8.0之间的条件下,BIOFOR对污染物的去除效率达到最佳;(4)运行表明,该组合技术具有较强的脱氮能力,对于减少水体富营养化具有十分重要的意义;(5)经过半年多实际工程的现场调试与运行,验证了利用预缺氧—BIOFOR组合工艺处理L—乳酸生产废水的可行性和实用性,得出该组合技术具有占地面积小,处理效果好,运行费用省,耐冲击负荷能力强等优点,是一项新型、经济的污水处理技术。

9. load 1

9. Methods: 41 Wistar male rats we re divided into five groups: control group, exercise group, exercise recovery gro up, bilirubin-treateol exercise group anol bilirubin-treateol exercise recover y group. The rats were administrated with 1 μmol/kg body weight of bilirubin or sa line once every day for 4 weeks, after swimming with load for 2 h, all of the ra ts were killed and several index were determined.
    将Wistar大鼠随机分为对照组、运动组、运动恢复组、胆红素处理运动组、胆红素处理运动恢复组,共5组,分别灌胃1 μmol/Kg体重的胆红素或生理盐水4周,负重(体重的5%)游泳2 h后处死,测定有关指标。

10. In recent development of modern Chinese paintings, the theme of the main function of conversion there were two trends: one, the theme of functional significance from the load to the formal conversion; 2, reproduced from an objective function subject to the subjective performance of the conversion.
    近现代的中国画的发展中,题材的功能主要出现了两种转换的趋势:1、题材的功能从负荷意义到形式化的转换2、题材的功能从客观再现向主观表现的转换。

11. load 1

11. According to the main equipment of Wei 12-1 workover rig and drilling basis data of adjustment well, the hook load and torque of drill string are found out and a new drilling string is presented by using the torque and drag analysis model and calculating software, on which depend to calculate and evaluate the capacity of main drilling equipment of Wei 12-1 workover rig, such as derrick, drawworks, and rotary table, as well as hoisting equipment (traveling block, hook and swivel) and drill line etc.
      根据涠12-1修井机主要配套设备和钻调整井的钻井基础数据,运用钻柱摩阻的计算模型,对侧钻过程中钻柱的摩阻/扭矩进行分析计算,提出新的钻具组合,计算大钩载荷及扭矩载荷,并根据计算出的大钩载荷及扭矩载荷,对平台修井机主要钻井设备井架、绞车、转盘、提升设备、钻井大绳等的承载能力进行分析计算,得出分析研究结论,并提出改造的具体思路及相关配套技术的实施方案。

12. load 1

12. According to dynamic similarity theory an experimental model with 1:100 ratios is made out of raw material of ABS plastic in this paper For the train movable load on the surface of bridge, full load of train is considered as the only load behavior.
      本文以ABS塑料为原料,按照动力相似理论,制作了一个比例为1:100的试验模型。

13. The thrust coefficients and propulsive efficiency of a two-dimensional flexible fin with heaving and pitching motion were computed using FLUENT. The effect of different locations of the pitching axis on propulsive performance was examined using three deflexion modes which are respectively, modified Bose mode, cantilever beam with uniformly distributed load and cantilever beam with non-uniformly distributed load.
      利用FLUENT软件数值计算了二维柔性鳍作升沉纵摇运动时的推力系数及推进效率,探讨了修正Bose变形方程、均匀载荷和非均匀载荷悬臂梁变形方程等三种柔性模式下纵摇轴位置对摆动鳍推进性能的影响,其中纵摇轴在尾缘处能够获得更大的推力,而最高的推进效率分别对应修正Bose模式下纵摇轴距首缘1/3弦长处和悬臂梁柔性变形模型下纵摇轴距首缘2/3弦长处。

14. load 1是什么意思

14. These parts are to be loaded using the same fixture, the same loading methods and the same test load determined in Section 3.1.1 for threaded parts or Section 3.1.2 for non-threaded parts.
      这些零件用相同的夹具装夹,相同的装夹方式和相同的试验载荷(螺纹件按3.1.1条,无螺纹件按3.1.2条)。

15. The energy saving potential of lighting in shopping mall and dynamic characteristics of cooling load of central air-conditioning systems.
      1引言良好的照明和舒适的中央空调几乎是商场建筑不可缺少的部分,而这两部分的能耗也相当可观,占商场运营成本中较大的比重。

16. load 1的近义词

16. Results: Patient demographics included mean age 50 yr, 71% male, 68% high viral load, 94% genotype 1, mean weight 89 kg, 17% African American, and 67% Caucasian.
      结果:患者的人口统计学数据包括:平均年龄50岁、71%为男性、68%有高病毒载量、94%为基因型1、平均体重为89 kg,17%为非裔美国人、67%为高加索人。

17. load 1

17. The results indicate that severe seizure occurred for the gear pairs of AISI 1045 steel and 20CrMnTi steel which were subject to single full load running in testing in the presence of abrasive containing running in agents.
      结果表明:材质为45#钢的试验齿轮副和材质为20CrMnTi钢的试验齿轮副用含磨料跑合剂进行1 次满载跑合试验时,发生严重胶合;而采用化学跑合剂可以实现1 次满载跑合,且用化学跑合剂跑合后的齿面比用普通油跑合后的齿面抗胶合能力提高1 个载荷级,显示化学跑合剂在齿轮中的应用很有潜力。

18. load 1的近义词

18. By using GSJ-1 rock pressure equipment, DZ-WCI hydraulic prop yield load inspection instrument and steel tape to proceed full measuring of rock pressure in 11103 sub-level caving mining of the Bao Yu Shan coal mine.
      通过利用GSJ-1型矿压仪、DZ-WCI型单体液压支柱工作阻力检验仪及钢卷尺对宝雨山煤矿11103放顶煤工作面进行了全面矿压观测和研究,掌握了顶板运动规律、工作面矿压显现特征和顶板控制特征。

19. This result was with default amd cooler, after all the user set the HT multiplier to3x, with vcore1.512 v and it obtained the frequency of 2888 MHz, at which the processor preserved stability under load.
      这一结果是与违约热潮冷却后,所有用户确定乘数为室内感到高温、五、以1.512vcore又获888兆赫的频率,该处理器负荷下稳定保存。

20. Thermal comfort and indoor air quality requirements are presented; the contents cover the following topics:(1) Concept of air-conditioning, (2) Thermal principle, (3) Psychrometry and wetted-surface heat transfer, (4) Heating and cooling-load calculations, (5) Air-conditioning systems, (6) Fan and duct system, (7) Pumps and piping, (8) Cooling and dehumidifying coils, (9) Air-conditioning controls, (10) Absorption refrigeration, (11) Heat pump, (12) Cooling towers and evaporative condensers.
      课程大纲本课程将介绍空调工程与系统设计,藉由湿空气线图讨论空气调节之过程,分析人体舒适与空气品质之需求,及各种空调设备系统之设计,内容涵盖如下:(1)空调的概念(2)热原理(3)湿空气与湿表面热传(4)加热与冷却负荷估算(5)空调系统(6)风扇与风管系统(7)泵与管路配置(8)冷却与除湿盘管(9)空调自动控制(10)吸收式冷冻系统(11)热泵(12)冷却水塔与蒸发式冷却。

load 1 单语例句

1. When it made its first ever journey on July 1, it carried a load of this worldly excitement into Lhasa.

load 1是什么意思,load 1在线翻译,load 1什么意思,load 1的意思,load 1的翻译,load 1的解释,load 1的发音,load 1的同义词,load 1的反义词,load 1的例句,load 1的相关词组,load 1意思是什么,load 1怎么翻译,单词load 1是什么意思
本网站内容收集于互联网,《教育资源网》不承担任何由于内容的合法性及健康性所引起的争议和法律责任。 欢迎大家对网站内容侵犯版权等不合法和不健康行为进行监督和举报。
邮箱: [email protected](替换#为@)
鄂ICP备18008168号-2
Copyright ©2020-2021 edu.pub All rights reserved.